Hurt Road

Project:
Hurt Road Sidewalks

Details:
This project in Marietta, Georgia consisted of five-foot sidewalks being constructed on the south side of Hurt Road from Merry Oak Road extending east approximately 2,000 linear feet tying into the existing sidewalk at Light of Hope Presbyterian Church.  A 10-foot wide urban shoulder with 24-inch curb and gutter and a two-foot wide grass strip was constructed throughout the entire project maintaining a minimum of 12-foot wide lanes.
Other Projects:
West Sandtown Rd     |     Barrett @ Chastain     |     Floyd Rd Trail     |     Piedmont Rd (West)
Scroll up